Number the walls and corresponding sections of baseboards to easily match them up later.
Are baseboards removed to install carpet. In my house they had to go from carpet to tile and lino. It is frequently removed from a hardwood floor when the hardwood is being carpeted over. Carpet is always one of the last jobs performed on a new build because removing the baseboards for installation is not only unnecessary but can be extremely costly. When installing baseboard before carpet the easiest thing to do is to install it even with the bottom edge of the.
The tack strip is nailed around the perimeter of the room right along side the base board. The baseboard goes in first always the carpet installers don t like this if they have to install new thicker baseboard for the customer they have to remove the old tack and install new this is very time consuming and their usually on piece work. No baseboards do not need to be removed. When installing baseboards before carpet ask the installer how large of a gap to leave between the floor and the trim e g.
Baseboards do not need to be removed. So in the above photo behind the kids inspecting the carpet removal there is now a space under the baseboards which was previously filled by the carpet. Thus would look unfinished if the baseboards were not altered in some way. Remove the baseboards the day before the flooring installation so you can move furniture away from the walls.
This space is bigger than the thickness of the new floors we were installing. If you run into a situation where it is being used to cover poorly installed carpet you need to fire the installer not assume that it s some standard lazy assed technique. The spacer is then removed and the resulting gap is filled with base shoe. The idea is that you should be able to install new carpet in a future remodel without having to remove the baseboard.
The carpet installer can run the tack strip up to the trim then roll excess carpet under the trim. Use a utility knife to slice any caulk that secured the baseboard to the wall. The carpet is attached to the tack strip stretched and cut along the tack strip. Therefore you do not have to raise the baseboard if it was installed with normal space underneath for carpet installation typically a piece of scrap plywood or subfloor or baseboard is used as a gage during installation so you see 3 8 and 1 2 space commonly although i have seen as much as 1 which is too much for most carpets.
Personally i have never seen a shoe molding used in a carpet installation. While you can have your baseboards removed when fitting a new carpet most contractors are going to work around it.